contact us

Whether you are a homeowner, an industry professional, fellow blogger or just curious to know more about the place home, we are excited to hear from you. 

Email us directly at theplacehome@gmail.com, connect with us through social media or submit the form!

           

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

THE-PLACE-HOME-blog-banner-final.jpgasdfsdf

blog

 

 

 

Filtering by Category: the home experienced

first floor renovation | framing days

Emily Oster

*This series was written while we were undergoing construction several months ago - hence the present tense. If you missed the first post of this series check it out here and the second here.

Today, we are on the sixth and final day of framing. The drywall contractors will arrive first thing Monday (its Friday as I write this) to close it all up. The framing has included 4 openings and the built in as well as the dividing wall between what will be our mud room and kids playroom. All openings are in our back hall which now feels like a nice transitional space rather than the dark and cramped hallway it was before we started.

The dividing wall between the mud room and playroom ended up being a last minute add on and is setting us up for what will be phase two of our first floor renovation. As we talked through things with our contractor, we just realized it made no sense to re-drywall and paint walls that we were planning on opening up in the near future. So we made the call to put in the wall as well as rough in the plumbing and electrical to give us more than a jump start on phase two. With this decision, the toy room will be ready for use and will just need a new light and probably a change out of the carpet. Phase two (which will hopefully happen in the fall) will then be just the mud room build out. This will include new flooring, cabinetry and appliances as well as the final plumbing and electrical work to get the washer and dryer moved upstairs and out of our nasty basement. It really won't be a very big project which makes it tempting to tackle now but we just don't have the means (financially or mentally) to undertake the work. By postponing the room, I will give myself the time to pick out the finishes I want and not have to rush to find something in a day. And even though the space won't be finished, it will still be super functional for us as a drop all space - coats, shoes, dog kennel, cleaning products etc. 

Thus far, the work has really gone as planned which is always scary to say/type out loud. The contractors have been great to work with and knowing that the project is short has made the construction process quite easy to live through. I feel totally confident that moving forward with the project was the right thing to do as Jeff and I have been able to give full attention to the project and we haven't had to worry about meeting the needs or schedule of the baby. The space is turning out beautifully - even better than I could have imagined. The only thing that is really frustrating me at the moment is paint color selection....I have till Monday to pick out my colors so the clock is ticking. Below are progress images from the past week or so. 

Want to read more? Check out one or all of these related posts. 

first floor renovation | demo days

Emily Oster

*This series was written while we were undergoing construction several months ago - hence the present tense. If you missed the first post of this series check it out here

As I write this we are on day three of demo. Today, will be the last day of the really messy part and "knock on wood" no really big demons have been found. On the morning of day one, I had just general anxiety about how things would unfold as things came down. We had developed contingency plans on the unknowns we knew about - ceiling height, radiator pipes and air duct - but I was still nervous that there would be some insurmountable monster lurking behind the wall. Luckily, by the end of day one we had pretty much figured out that things were as we suspected. The most welcomed discovery was that there was nothing in the dropped hallway ceiling and we would be able to raise the ceiling height substantially. 

Yesterday, the plumber came out to inspect the set of radiator pipes that need moving and seems confident that he would be able to do the job in one day. Of course, I then checked the weather and it is only suppose to be a high of 23 degrees on that day so I am not sure how that is going to go. We might end up sleeping in the den with the wood stove burning if they can't get the work done and the system back up and running in one day's time. Day two was also the start of framing as Jeff and the contractor discussed things like header size, bearing points, etc. I also presented our contractor with our new plan for our TV wall. For the previous few days, I have been all consumed with trying to figure out what to do and finally reached a design I was happy with - more details on that in another post. 

By the end of day two, all but one wall had been demo'd and the new wall/opening into the kitchen had been framed out. As our contractors like to describe the process, it is a very "nasty" job of tearing down plaster and lath walls. We have done our best to tarp and seal off openings but the first floor is pretty much covered in a good layer of dust. For the past two nights and several more to come, we un-tarp the kitchen and wipe down everything to have dinner. We then retreat into our den which is stocked full of furniture and other items to eat dinner and watch TV. In the morning, after breakfast and before the guys arrive, I re-tarp the kitchen and seal off the den. So far, the mess hasn't been so bad and we should just be about over the worst of it. The whole project should take a month so I think knowing that we don't have to live in a mess for that long makes it much more bearable. 

Today, the electrician arrived first thing to remove old wiring and get things out of the way for the new openings. The plan for the day includes taking out the last wall and framing out the main opening into the living room. I am feeling a bit anxious as they undertake the day's task as its the biggest design gesture of the project and requires the most involved structural work. By tonight or maybe tomorrow at the latest, we should have a really good sense of how the spaces will flow together which I am super excited to see. Below are some pictures from day one and two.  

Want to read more? Check out one or all of these related posts. 

first floor renovation series

Emily Oster

Not to jinx ourselves but the baby has finally started to take some longer naps and I have gotten caught up on client work.... SO I can get back to blogging! Its not going to be my finest work as I am still going on limited sleep but its a start!

As I mentioned way back in May, I wrote a first floor renovation series as we were undergoing construction. I wanted to give a play by play of the process and an intimate look of what a renovation actually looks like - not just the fun before and after reveal. To recap, we have been thinking about doing a first floor renovation for a long time (see this post, this post and this post). We weren't planning on undertaking anything before Jane was born but then I got to nesting... and worrying about the house being a mess with a baby. So somewhat on a whim, we decide to go for it. 

This is the original plan of the house (architect friends please forgive the crude drawing).

via THE PLACE HOME

via THE PLACE HOME

The main goal of the renovation was to correct the awkward flow of the back hallway and entry into the kitchen. The kitchen was completely closed off by the hallway and the whole back of the house felt dark and cramped because of it. We also wanted the living room and kitchen to flow together creating a partial open floor plan that would make both spaces feel bigger and more comfortable.

This was the proposed plan we presented to our contractor the first week of January (dashed red lines show the existing walls).  

via THE PLACE HOME

via THE PLACE HOME

The plan was pretty simple - basically just straighten out the back hallway and create new openings into the living room, kitchen and mud room. The new back hallway would also get two large built in cabinets to replace the pantry. Another built in was planned for around the flue of the chimney to create a focal point of the room and a spot to hang our TV. At this point in the reno, we had planned on not touching the mud room and just saving it for a phase 2. 

These images were taken the day before demo started - our official "befores" - dishes and bad lighting for effect...

dining room looking into back hallway

dining room looking into back hallway

living room looking into back hallway

living room looking into back hallway

kitchen looking into back hallway - door into mud room

kitchen looking into back hallway - door into mud room

Want to read more? Check out one or all of these related posts.